Szabványkereső

Hivatkozási szám, azonosító jelzet, vagy a szabványcímben előforduló kulcsszó szerinti keresés:


ICS (a szabványok nemzetközi osztályozási rendszere) szerinti keresés

Nettó ár: 14400 Ft
Kosárba tesz
Alapadatok
Hivatkozási szám
MSZ EN IEC 62382:2025
Dokumentumazonosító
185145
Cím
Szabályozórendszerek a feldolgozóiparban. A villamos és műszerezési hurok ellenőrzése (IEC 62382:2024)
Angol cím
Control systems in the process industry. Electrical and instrumentation loop check (IEC 62382:2024)
Alkalmazási terület
1.1 General applicability This document defines procedures and specifications for loop check, which comprises the activities between the completion of the loop construction (including installation and point-topoint checks) and the beginning of cold commissioning. This document is applicable for the construction of new plants and for expansion or retrofits (i.e. revamping) of electrical and instrument (E&I) installations in existing plants (including PLC, DCS, panel-mounted and field instrumentation). It does not include a detailed checkout of power distribution systems, except as they relate to the loops being checked (i.e. a motor starter or a power supply to a four-wire transmitter). Loop checks can be performed throughout the lifecycle of the plant. This document is also applicable when loop checks are performed after commissioning. This document describes what is intended to be tested but not how the test is performed, due to the wide range of technologies and equipment available. The intent of this document is to provide a means for all parties, including the owner, the installer and the vendor, to clearly establish and agree on the scope of activities and responsibilities involved in performing these tests in order to achieve a timely delivery and acceptance of the automation system. The activities described in this document can be taken as a guideline and adapted to the specific requirements of the process, plant or equipment. 1.2 Exclusions 1.2.1 Prior and post activities Engineering and manufacturing activities prior to or after the loop checks, such as FAT, SAT, SIT and commissioning, are not covered by this document. 1.2.2 Regulated industries For applications in the pharmaceutical or other highly specialized industries, additional guidelines (e.g. good automated manufacturing practice (GAMP)), definitions and stipulations apply in accordance with existing standards. 1.2.3 Safety instrumented systems All loops are checked in accordance with this document. However, loops involved in safety instrumented systems are subjected to additional testing. The IEC 61511 series provides requirements for checks and validation of safety instrumented systems. 1.2.4 Manufacturing execution systems Testing and verification of manufacturing execution systems (MES) is not covered by this document. 1.2.5 Advanced process control Testing and verification of advanced process control (APC) are not covered by this document. 1.2.6 Security for industrial automation and control systems The IEC 62443 series provides requirements for network and system security. 1.2.7 User-specific procedures and requirements This document does not describe any user-specific procedures and requirements that can be related to loop check, e.g. positioning of process isolation valves, what state to leave the loop in after check, calibration. It is the user's responsibility to ensure that these are added to the loop check requirements as necessary.
ICS
25.040.40 Ipari folyamatok mérése és vezérlése
A szabvány nyelve
angol
Az érvényesség kezdete
2025-02-01
További adatok
Forrás
idt EN IEC 62382:2024; idt IEC 62382:2024
Utód
Módosítás
Kiegészítő információk
SZK-közlemények
Kapcsolódó európai jogszabály
Kereskedelmi adatok
A szabvány
kapható formátuma
Papír ,
PDF (letöltés) (a fájl mérete: 1410602) ,
oldalszáma
31 oldal; P kategória
ára
Nettó: 14400 Ft
Bruttó:
Papír formátum esetén (20% nyomdai költséggel, 5% Áfával): 18144 Ft
PDF (letöltés) formátum esetén ( 27% Áfával): 18288 Ft
Szabvány életútja
Megtekintett szabvány

MSZ EN IEC 62382:2025

2025-02-01

Utódok

Jelenleg nincsenek utódok